Vietnam's largest coastal eco-city (2,870ha) — first New7Wonders Future Cities participant — with Tiger Woods golf, VinWonders, Cleveland Clinic hospital, and VinSpeed 350km/h metro, built to ESG++ standards at only 16% density.
Vietnam's largest sea-reclamation coastal mega-urban project by Vingroup, spanning 2,870 hectares with 121km of coastline in Cần Giờ district. Designed as an ESG++ smart city with world-class amenities including a 108-story landmark tower, 443ha Paradise Lagoon, two championship golf courses, and the Blue Waves Theatre.
Better for long-term living than for investing.
Vietnam's most ambitious coastal eco-city — 2,870ha with Tiger Woods golf, Cleveland Clinic hospital, VinWonders, and a direct VinSpeed metro to D1 in 12 minutes — but none of it exists yet, and today's reality is a 50km, ferry-dependent drive and a 3-hour transit commute to the CBD. Best for buyers purchasing a long-horizon vision rather than a present-day neighborhood.
Homeowner: A compelling long-term homeowner thesis anchored by Vinhomes' track record and an extraordinary planned amenity set — Cleveland Clinic hospital, 97-facility Vinschool K-12, two championship golf courses, and a 2,870ha eco-city at only 16% building density. The honest qualifier is that nothing is operational yet: the nearest working hospital is roughly 45km away, and the current commute to D1 takes over 3 hours by ferry and bus. Homeowners willing to accept a 3–5 year build-out horizon and buy for a resort-primary lifestyle will find the vision unmatched; those who need functioning urban amenities today should look elsewhere.
Investor: A high-conviction, long-duration infrastructure bet run by Vietnam's most capable residential developer. Vingroup's political capital and balance sheet make catalyst delivery more credible here than on any peer project — the Cần Giờ Bridge formally started construction in June 2026 and the VinSpeed metro broke ground December 2025, both with committed timelines. The returns thesis still hinges on those two catalysts delivering by 2028–2029; plan for 3–5 years of illiquidity before a mass-market resale pool exists. The Grand Island shophouse rental guarantee (6%/year, 5 years) is the only near-term yield structure available while waiting.
| Unit price | 2,5 tỷ – 75 tỷ |
| Launch price | 145 triệu/m² |
| Project | Price | Distance |
|---|---|---|
| Vinhomes Green Paradise Cần Giờ | 125 triệu/m² | — |
| Global City (Masterise, Thu Duc) | Similarly priced for comparable townhouse and shophouse products, with some units 10–15% cheaper per m² | 15km from D1 with Metro Line 1 corridor access and operating amenities today — far more accessible but without beach, golf, or resort scale |
| Aqua City (Nova Group, Đồng Nai) | 10–20% cheaper per m² for comparable landed product | Similar eco-city concept on a smaller scale (~1,000ha) with a Long Thành Airport catalyst; Nova Group's financial restructuring is an ongoing concern that reduces sponsor certainty versus Vingroup |
| Novaworld Hồ Tràm (Nova Group, BRVT) | 30–40% cheaper per m² for comparable coastal resort product | Coastal resort in Bà Rịa – Vũng Tàu, roughly 2 hours from HCMC — more accessible today but a far smaller vision with different buyer demographics and the same Nova Group developer risk |
Primary pricing is broadly stable — project-wide townhouses are flat at approximately 126M/m², while the Haven Bay sub-zone registered a notable correction to approximately 114M/m² in April 2026 listing data; no secondary market exists yet.
| Developer | Vingroup |
| Status | 0 of 4 delivered |
| Completion | 2030 |
| Total Units | 64000 |
| Towers | 11 |
| Launch Date | 2025-04 |
| Handover | 2026-Q4 |
| Construction Permit | Approved |
| Pink Book | pending |
| Legal Notes | Detailed Planning 1/500 approved Jan 24, 2025 (Decision No. 340/QĐ-UBND, HCMC UBND). Groundbreaking Apr 19, 2025. Sales: Green Bay (Oct 2025), Haven Bay (Dec 2025). 23 legal documents publicly disclosed on Ministry of Construction housing system as of May 2026, including PM Investment Decision 826 (expanded to 2,870ha), land allocation decisions 3086 & 1424 (2,294ha), and construction permits 422, 08, 152. Sales qualification confirmed by Dept. of Construction under Decree 94/2024. IHG partnership (4 hotel brands, ~1,060 rooms, Apr 2026); Marriott partnership (Ritz-Carlton + Marriott Hotel, ~700 rooms, May 4, 2026). Cần Giờ International Port: investor decision Apr 29, 2026; ceremony Apr 30, 2026; actual construction targeted Q4 2026. Cần Giờ Bridge (6.3km, 6 lanes, PPP ~VND13,200B, Masterise Group): ceremonial groundbreaking Jan 15, 2026; formal construction groundbreaking June 3, 2026 (per HCMC Document 1907/UBND-DA); target opening June 30, 2029. VinSpeed metro (54km, 350km/h, VND102,430B): groundbreaking Dec 19, 2025; HCMC land clearance plan issued Mar 2026 (~154ha, 507 households + 16 organizations); Q4 2026 site handover to investor confirmed; commercial operation Q4 2028. Cần Giờ–Vũng Tàu sea bridge (~VND104,400B, 100% Vingroup): approved; as of June 2026, still in ministerial review/appraisal, groundbreaking not yet confirmed. Bến Lức–Long Thành Expressway (58km): ~96% complete; Phước Khánh Bridge (final section, 3.1km) — side span closed mid-May 2026, main span targeting mid-June 2026, traffic opening July 2026; full route confirmed September 30, 2026. First low-rise handover targeted Q4 2026 (developer materials indicate late 2026 – mid 2027 range for initial deliveries). Pink books expected 12–24 months after handover under Decree 42/2024 (reclaimed land certificates equivalent to standard land); none issued to date. |
Vinhomes Green Paradise Cần Giờ
| CBD (peak) | 116 min |
| CBD (off-peak) | 112 min |
| Airport (peak) | 152 min |
| Airport (off-peak) | 143 min |
| Long Thành (peak) | 151 min |
| Long Thành (off-peak) | 145 min |
Upper-class families, long-horizon investors, and resort-lifestyle seekers. The planned community is designed for 230,000 residents and 8–9 million annual tourists, served by a self-contained eco-city with Vinschool K-12, Vinmec International Hospital (Cleveland Clinic partnership), and the VinSpeed metro Depot Station all planned within the project. Current residents are early purchasers in the Green Bay and Haven Bay sub-zones, living in a coastal resort setting during a multi-year construction build-out.