VI
Vinhomes Cần Giờ
Selling

Vinhomes Green Paradise - Coastal Mega-City in Cần Giờ

Vingroup

Under construction · Developer selling

Vietnam's largest coastal eco-city (2,870ha) — first New7Wonders Future Cities participant — with Tiger Woods golf, VinWonders, Cleveland Clinic hospital, and VinSpeed 350km/h metro, built to ESG++ standards at only 16% density.

🏗️ Construction · 2030🏢 64000 units

Vietnam's largest sea-reclamation coastal mega-urban project by Vingroup, spanning 2,870 hectares with 121km of coastline in Cần Giờ district. Designed as an ESG++ smart city with world-class amenities including a 108-story landmark tower, 443ha Paradise Lagoon, two championship golf courses, and the Blue Waves Theatre.

News & Updates

VinSpeed metro land clearance delayed — full handover to investor not until Q4 2026
Infrastructure · Apr 2026 · domo.vn
Can Gio Bridge completion pushed to mid-2029, 1.5 years later than originally marketed
Infrastructure · Apr 2026 · domo.vn
Can Gio-Vung Tau sea bridge (14km, 104,400B VND) planned groundbreaking June 2026
Infrastructure · Apr 2026 · domo.vn
No secondary market transactions after 6 months of sales — liquidity remains zero
Market · Apr 2026 · domo.vn
All 5 sub-districts entering simultaneous construction, 90%+ internal roads asphalted
Construction · Apr 2026 · domo.vn
Show all 7 updates
58
Lifestyle Score
Average
Daily convenience: dining, shopping, entertainment, transit access
60
Family Score
Good
Family suitability: schools, hospitals, parks, safety

Quick Verdict

6
🏠 End-user
Mixed
5.5
📈 Investor
Mixed

Better for long-term living than for investing.

Vietnam's most ambitious coastal mega-project with unmatched 2,870ha scale and world-class amenity vision. But key infrastructure timelines are stretching — Cần Giờ Bridge now mid-2029, VinSpeed metro likely 2029 — extending the speculative holding period by 1-2 years beyond what was marketed at launch.

Is this a good deal?

Project Price Distance
Vinhomes Grand Park Resale 60-85M VND/m2 (apartments), fully delivered Same developer, established urban location in Thu Duc with Metro Line 1 — proven appreciation and active rental market
Aqua City (Novaland) 25-35M VND/m2 (heavily discounted from peak) Cautionary comparable — similar mega-project in Dong Nai saw 30-50% drops after infrastructure delays. Bridge dependency mirrors Can Gio risk
NovaWorld Phan Thiet Townhouses from 2.6B, villas from 5-8B VND 1,000ha in Phan Thiet, 200km from HCMC — much cheaper but much further, no metro, resort-only positioning

Score Breakdown

🏠 End-user
Risks
4
Value for money
6
Livability & family fit
6.5
Location & connectivity
5
Legal confidence
6.5
Quality & amenities
7.5
Why the scores differ

End-user: Mixed project suitable only for certain buyers. Vietnam's most ambitious real estate project with an extraordinary amenity vision (Tiger Woods golf, VinWonders, Vinmec Cleveland Clinic), but the reality today is a construction site 50km from CBD accessible only by ferry. Sea-reclaimed land, no pink books, and every infrastructure promise (bridge, metro) is 2+ years from delivery. Only works for HNW resort-lifestyle seekers who don't need CBD commute access.

Investor: Weak project with notable concerns. Pure infrastructure bet with no rental market, zero liquidity, high entry prices (10B+ minimum), and a value proposition entirely dependent on bridge and metro delivery timelines. The Aqua City cautionary tale (similar mega-project, -30-50% prices on delays) is directly relevant. VinSpeed metro breaking ground is encouraging, but completion timeline remains uncertain. No downside protection — if infrastructure stalls, capital is trapped in illiquid reclaimed coastal land.

Should you buy here?

Best for:
  • High-net-worth families seeking resort-lifestyle primary residence who don't need daily CBD commute
  • Golf enthusiasts — two Tiger Woods and RTJ II championship courses within the project
  • Families wanting self-contained eco-city with Vinschool and Vinmec who can wait 3-4 years
  • Buyers who prioritize space, nature, and coastal lifestyle over urban convenience
Not ideal for:
  • Anyone needing daily CBD commute — 50km, ferry-only access until at least 2028
  • Budget-conscious buyers — cheapest product starts at 10B VND
  • Risk-averse buyers — sea-reclaimed land, pre-delivery, infrastructure-dependent
  • Families needing immediate school/hospital access — amenities are 2-4 years from operational

Pros & Cons

Pros

  • 2,870ha with Tiger Woods golf, VinWonders
  • Full Vingroup ecosystem: Vinmec, Vinschool, Vincom
  • Approved 1/500 planning, long-term ownership
  • 5+ infrastructure projects under construction
  • First New7Wonders Future Cities participant
  • Only 16% built-up, 80%+ green and water

Cons

  • 50km from D1, ferry until bridge opens
  • Sea-reclaimed land, long-term subsidence risk
  • Pre-delivery, amenities years from operation
  • High entry: from 10B VND townhouse
  • Zero resale market, capital locked in

Unit Types

Apartment
2 Beds · 2 Baths · 50–180 m²
1,9 tỷ - 6 tỷ
Young families
Shophouse
3 Beds · 3 Baths · 71–288 m²
15 tỷ - 30 tỷ
Growing families
Townhouse
4 Beds · 4 Baths · 60–180 m²
10 tỷ - 14,6 tỷ
Growing families
Townhouse
4 Beds · 4 Baths · 75–180 m²
10 tỷ - 18 tỷ
Growing families
Detached Villa
5 Beds · 6 Baths · 256–900 m²
25 tỷ - 40 tỷ
Growing families
Twin Villa
5 Beds · 5 Baths · 167–580 m²
18 tỷ - 25 tỷ
Growing families
Mansion
6 Beds · 6 Baths · 600–1200 m²
60 tỷ - 120 tỷ
Growing families

Project Details

DeveloperVingroup
ConstructionConstruction
Completion2030
Total Units64000
Towers11

Legal Information

Launch Date2025-04
Handover2026-Q4
Construction Permitapproved
Pink Booknot_issued
Legal NotesDetailed Planning 1/500 approved Jan 24, 2025 via Decision No. 340/QĐ-UBND by HCMC UBND. Groundbreaking April 19, 2025. Sales opened Q4 2025. First low-rise handover targeted late 2026 - mid 2027. Full project completion by 2030.

Amenities

👨‍👩‍👧 Family: Vinschool education system and Brighton College international school (British curriculum). Vinmec International Hospital with Cleveland Clinic strategic advisory partnership — comprehensive specialties and world-class medical equipment. 53km public beachfront with children's play areas. Young Paradise Hub youth programs and Green ID community reward system.
🏋️ Fitness: Two 18-hole championship golf courses: Tiger Woods Sunset Course (8,191 yards) and Robert Trent Jones II Sunrise Course (8,325 yards) spanning 155ha. 53km beachfront with water sports (SUP, sailing, surfing). Beach clubs and wellness/spa centers.
🏖️ Lifestyle: VinWonders theme park and Vinpearl Safari (122ha) with ~200 rides, 68m artificial snow mountain (world's tallest), five-continent festival park, immersive movie world, and 15.5ha hybrid water park. Winter Wonderland (30,000m² ice park). Blue Waves Theatre (5,000 seats, 40 conference rooms, 8 wedding halls, 45,000m² exhibition zone). Cosmo Bay 24/7 retail hub. Landmark Harbour international yacht marina.
🛒 Convenience: VinBus zero-emission electric transit throughout project. Vincom Mega Mall on-site. 100% renewable energy target (offshore wind, solar, battery storage). 50m-wide Future Boulevard as main artery. VinSpeed metro station within project (under construction). AI-powered smart mobility with centralized ESG Smart Hub using IoT, Big Data, and AI.
🌳 Garden🧒 Play Area🔒 Security🅿️ Car Parking🚌 Shuttle Bus🎾 Tennis Court🛍️ Shopping Mall🏀 Basketball Court🏍️ Motorbike Parking⚽ Multi-Purpose Court

Location & Commute

Map

Vinhomes Cần Giờ

40 min
CBD
60 min
Airport
CBD (peak)75-90 min via Bình Khánh ferry (pre-bridge). Projected 45-60 min after Cần Giờ Bridge completion.
CBD (off-peak)60-75 min via Rừng Sác Road + ferry. Projected 40 min after bridge.
CBD (motorbike)60-70 min to District 1 (pre-bridge)
Airport (peak)90-120 min to Tân Sơn Nhất via current roads
Airport (off-peak)60-75 min via Bến Lức – Long Thành Expressway (once fully open)
🚇
Metro
Cần Giờ Station (VinSpeed high-speed metro Bến Thành – Cần G
🛍️
Mall
Vincom Mega Mall
🏫
Schools
2 nearby
🏥
Hospitals
1 nearby
Major Roads
Rừng Sác RoadCần Giờ BridgeCần Giờ – Vũng Tàu sea bridgeBến Lức – Long Thành Expressway
🔇 Low Noise🌊 Low Flood✈️ No Flight Path🛣️ Not Near Highway🏠 None Airbnb

Upper-class families, investors, and resort-lifestyle seekers. Planned population of 230,000 residents plus 8-9 million tourists per year. Self-contained eco-city with Vinschool, Brighton College, and Vinmec hospital on-site.

🏫 International Schools
  • Vinschool (within project)
  • Brighton College (within project)
🏥 Hospitals
  • Vinmec International Hospital (Cleveland Clinic strategic advisory partnership, within project)
Things to consider (not deal breakers)
⚠️ Traffic
Relies on Bình Khánh ferry until Cần Giờ Bridge (6.3km, 6 lanes, VND 13,200B, PPP model) completes. ...
Relies on Bình Khánh ferry until Cần Giờ Bridge (6.3km, 6 lanes, VND 13,200B, PPP model) completes. VinSpeed metro (54km, 350km/h, VND 102,430B) under construction — Phase 1 serves Bến Thành and Cần Giờ stations. Cần Giờ – Vũng Tàu sea bridge (14km incl. 3.1km subsea tunnel, VND 104,400B, 100% Vingroup-funded) in planning. Bến Lức – Long Thành Expressway (58km) at 96%+ completion.
→ Cần Giờ Bridge (6.3km, 6 lanes) under construction to replace ferry bottleneck. VinSpeed metro (350km/h) under construction — 13 min to Bến Thành. VinBus zero-emission electric transit within project. Cần Giờ – Vũng Tàu sea bridge (14km) planned as second connection.
🌊 Flood Risk
Sea-reclaimed land (1,357ha) with K-DPM soil solidification technology and modern drainage infrastru...
Sea-reclaimed land (1,357ha) with K-DPM soil solidification technology and modern drainage infrastructure. 50+ km coastal protection dikes. Adjacent to UNESCO Cần Giờ Mangrove Biosphere Reserve (75,000ha) providing natural buffer. Integrated rainwater harvesting and wastewater recycling systems.
→ Modern sea-reclamation engineering using K-DPM (Kinetic Dry Pneumatic Mixing) soil solidification technology with Dutch expert consultancy. 50+ km coastal protection dikes. Underground drainage installed during construction. UNESCO Cần Giờ Mangrove Biosphere Reserve (75,000ha) provides natural flood buffer. Rainwater harvesting and wastewater recycling systems integrated. Project elevated above sea level.
🚧 Construction
Near active construction sites
More in the app
Live Heatmaps
Live Heatmaps
See lifestyle & family scores for every neighborhood
Map Search
Map Search
Find homes directly on an interactive map
This area scores 58 for Lifestyle Score · 60 for Family Score

Phases

Grand Island
Grand Island
0 listings
Green Bay
Green Bay
0 listings · 3821 units
10 tỷ - 48 tỷ
Construction
Haven Bay
Haven Bay
0 listings
Construction
Paradise
Paradise
0 listings

Projects by Developer

Growth Catalysts

  • 🚧Cần Giờ Bridge (6.3km, 6 lanes) (2029)
  • 🚧VinSpeed high-speed metro Bến Thành – Cần Giờ (54km, 350km/h) (2028)
  • 🚀Cần Giờ – Vũng Tàu sea bridge & tunnel (14km incl. 3.1km subsea tunnel) (2029)
  • 🚧Bến Lức – Long Thành Expressway (58km) (2026)
  • 🚧Long Thành International Airport (Phase 1, 25M passengers/year) (2026)
  • 🚀Cần Giờ International Transshipment Port (VIMC-MSC-Saigon Port JV, ~$5B) (2030)

Interested in Vinhomes Cần Giờ?

Vinhomes Cần Giờ
Vinhomes Cần Giờ
Vinhomes Cần Giờ
What do you need?

Your contact will only be shared with the listing agent.